Thursday, March 6, 2008

Design Images



A few images to record the design process:

Porch work 2008.03.03




  1. Installed new pump at creek
  2. installed new kitchen faucet
  3. hooked up hot water (this is temporary, we had to bypass the temp. control units and hot-wire it into the porch lights)
  4. built temporary out-door shower
  5. dug, poured 7 piers
  6. set 7 columns and placed top plates

Also:

  1. worked on Warrens truck
  2. cleaned the filth that was the kitchen
  3. roughly staked out the helenhouse (@ 22.5 degrees, may be better than 15 degrees)
  4. cursed jonathans name and the space he occupies
  5. measured grade for helenhouse (see pic)