A few images to record the design process:
Porch work 2008.03.03
Installed new pump at creek
installed new kitchen faucet
hooked up hot water (this is temporary, we had to bypass the temp. control units and hot-wire it into the porch lights)
built temporary out-door shower
dug, poured 7 piers
set 7 columns and placed top plates
Also:
worked on
Warrens
truck
cleaned the filth that was the kitchen
roughly staked out the helenhouse (@ 22.5 degrees, may be better than 15 degrees)
cursed jonathans name and the space he occupies
measured grade for helenhouse (see pic)